Square Footage Calculator
Use this free square footage calculator to get fast, accurate results.
๐ Your Assumptions
This square footage calculator converts length, width, and depth into total square footage and cubic yards, then tells you exactly how much concrete, gravel, or topsoil to buy. It is built for contractors, DIYers, and anyone ordering bulk materials who needs to avoid both short loads and wasted money. Enter your dimensions once and get the material quantity in the units suppliers actually sell.
How to Use This Calculator
Enter your project dimensions in feet and inches, then read the volume and material estimate.
1
Measure length in feet
Measure the longest side of the slab, patio, or garden bed and enter it in the Length (ft) field. For a 12-foot by 14-foot patio, enter 12. If your measurement is 12 feet 6 inches, enter 12.5.
2
Measure width in feet
Measure the shorter side perpendicular to the length and enter it in the Width (ft) field. For that same patio, enter 14. Multiply 12 x 14 to get 168 square feet of surface area.
3
Enter depth in inches
Enter the thickness or depth in the Depth (in) field โ this is in inches, not feet. A standard concrete walkway is 4 inches thick, a driveway slab is 4 to 6 inches, and a raised garden bed might be 12 inches deep.
4
Read the volume result
The calculator multiplies length x width x (depth รท 12) to get cubic feet, then divides by 27 to get cubic yards. A 12 ft x 14 ft slab at 4 inches deep equals 56 cubic feet, or about 2.07 cubic yards.
5
Check materials needed
The Materials Needed output converts your volume into bags or truckloads. At 2.07 cubic yards, you would order 2.5 yards from a ready-mix truck, or roughly 94 bags of 80-pound concrete mix if you are mixing by hand.
What Your Results Mean
Each output tells you something different about how much material to buy and how to order it.
Volume in cubic feet
This is the raw three-dimensional space your project fills. A 10 ft x 10 ft slab at 4 inches deep is 33.3 cubic feet. Suppliers rarely sell by cubic feet, so this number is a stepping stone, not an order quantity.
Volume in cubic yards
Concrete, gravel, and topsoil are sold by the cubic yard in the US. One cubic yard equals 27 cubic feet. A 20 ft x 20 ft driveway at 4 inches deep is 6.67 cubic yards, which is just under one full short-bed dump truck load.
Materials needed in bags
An 80-pound bag of concrete mix yields about 0.6 cubic feet. For a 4 ft x 8 ft slab at 4 inches deep (10.67 cubic feet), you need 18 bags. Bags make sense under about 1 cubic yard; above that, ready-mix is cheaper per yard.
Materials needed in truckloads
A standard ready-mix concrete truck carries 8 to 10 cubic yards, and most suppliers charge a short-load fee under 3 yards. Gravel and topsoil trucks typically haul 10 to 15 cubic yards. Ordering 2 yards of concrete often costs $150 to $250 extra in short-load fees.
Waste allowance
Add 5 to 10 percent to any concrete order for spillage, uneven subgrade, and over-excavation. For 6.67 cubic yards, order 7.0 to 7.3 yards. Running short mid-pour means a cold joint that weakens the slab.
Square footage vs. volume
Square footage (length x width) tells you how much surface you are covering โ useful for sod, paint, or tile. Volume adds depth and tells you how much material fills that surface. A 200 sq ft area needs 200 sq ft of sod but 2.47 cubic yards of concrete at 4 inches deep.
Key Terms
Cubic yard
A volume equal to a cube 3 feet on each side, or 27 cubic feet. Concrete, gravel, mulch, and topsoil are priced and delivered by the cubic yard in the US.
Square footage
The area of a flat surface, calculated as length times width in feet. A 12 ft x 15 ft room has 180 square feet of floor area.
Ready-mix concrete
Concrete batched at a plant and delivered by truck, usually priced per cubic yard with a minimum order. It is stronger and faster than bag mixing for slabs over about 1 cubic yard.
Short-load fee
An extra charge from concrete suppliers when you order less than a full truck, typically under 3 to 5 cubic yards. It covers the fixed cost of dispatching a truck for a small pour.
Waste allowance
A percentage added to your calculated volume to cover spillage, uneven ground, and measurement error. Standard practice is 5 to 10 percent, so 4 cubic yards becomes 4.2 to 4.4 yards.
โ Frequently Asked Questions
Multiply the length by the width in feet to get square footage, then multiply by the depth in feet to get cubic feet. For a 10 ft x 12 ft shed slab at 4 inches thick, the square footage is 120 sq ft, and the volume is 120 x 0.333 = 40 cubic feet, or 1.48 cubic yards. Divide cubic feet by 27 to convert to cubic yards, which is how ready-mix suppliers price concrete. At $150 to $180 per cubic yard, that slab costs roughly $222 to $266 in concrete alone, before labor or rebar. Always add 5 to 10 percent for waste โ 1.48 yards becomes about 1.6 yards, so order 2 yards to be safe. If you are pouring more than one slab or a driveway, run each section through the concrete calculator separately so you can sum the yards accurately and avoid a short load.
It depends on depth, but for a 4-inch slab over 100 square feet you need 33.3 cubic feet of concrete. An 80-pound bag of Quikrete or Sakrete yields about 0.6 cubic feet, so 33.3 รท 0.6 = 56 bags. A 60-pound bag yields about 0.45 cubic feet, so you would need 74 bags. At roughly $5 to $7 per 80-pound bag, that is $280 to $392 โ often more expensive than ordering ready-mix, which runs about $150 to $180 per cubic yard (1.23 yards here, so around $185 to $222 plus a possible short-load fee). Bags make sense for small pads under 1 cubic yard, like a 3 ft x 3 ft air conditioner pad at 4 inches deep, which needs just 4 bags. For 100 square feet, compare the two prices before committing. The gravel calculator works the same way if you are using crusher run or paver base instead of concrete.
Square feet measure area โ a flat, two-dimensional surface โ while cubic yards measure volume, which includes depth. A 20 ft x 30 ft driveway is 600 square feet whether it is 2 inches or 6 inches thick. But at 4 inches deep it is 600 x 0.333 = 200 cubic feet, or 7.41 cubic yards. At 6 inches deep it is 300 cubic feet, or 11.11 cubic yards โ 50 percent more concrete for the same square footage. This is why suppliers ask for cubic yards, not square feet: they need to know how much material actually fills the space. Square footage is what you use for sod, tile, paint, or mulch coverage. Cubic yards are what you use for concrete, gravel, sand, and topsoil orders. If you are buying topsoil for a 600 sq ft garden bed at 6 inches deep, you need 11.11 cubic yards โ the topsoil calculator will confirm that against bag or bulk pricing.
One cubic yard covers 81 square feet at 4 inches thick, 108 square feet at 3 inches, 65 square feet at 5 inches, and 54 square feet at 6 inches. The math: 27 cubic feet รท 0.333 feet (4 inches) = 81 sq ft. So a 10 ft x 10 ft patio at 4 inches deep needs 100 รท 81 = 1.23 cubic yards. A 24 ft x 24 ft driveway at 5 inches deep is 576 sq ft รท 65 = 8.86 cubic yards, which is close to a full 10-yard truck. Ready-mix concrete costs $150 to $180 per yard in most US markets in 2024, plus $150 to $250 for a short load under 3 yards and $50 to $100 for Saturday delivery. That 1.23-yard patio pour runs about $185 to $222 in concrete plus a short-load fee, so many homeowners bump the order to 3 yards or combine it with another project to avoid the penalty.
Divide the inches by 12. Four inches equals 0.333 feet, six inches equals 0.5 feet, and twelve inches equals 1.0 foot. The calculator does this automatically when you enter depth in inches โ that is why the Depth (in) field is separate from the length and width fields, which are in feet. If you entered 4 inches as 4 feet by mistake, a 10 ft x 10 ft slab would calculate as 400 cubic feet instead of 33.3 cubic feet โ a 12x over-order worth thousands of dollars. Common depths to keep in mind: 4 inches for walkways and patios, 4 to 5 inches for driveways carrying passenger cars, 6 inches for driveways with RVs or heavy trucks, and 2 to 3 inches for gravel paths. For a 12 ft x 20 ft driveway at 6 inches deep, the volume is 12 x 20 x 0.5 = 120 cubic feet, or 4.44 cubic yards. The gravel calculator uses the same depth conversion if you are laying base material first.
Yes โ add 5 to 10 percent to every concrete, gravel, or topsoil order. Excavated ground is rarely perfectly level, formwork bows slightly under the weight of wet concrete, and some material always sticks to the chute or wheelbarrow. For a 6-cubic-yard slab, 10 percent means ordering 6.6 yards, which rounds to 7 yards with the supplier. Running short mid-pour is the worst outcome: a cold joint forms where old and new concrete meet, and that seam can crack within a year. A second short-load delivery costs $150 to $250 extra and delays the finish. For gravel and topsoil, 5 percent is usually enough because they compact predictably. If your subgrade is soft or you are pouring over an old uneven slab, go with 10 percent. The mortgage calculator is unrelated here, but if you are financing a larger project like a driveway or foundation, run the total material cost through it to see the monthly impact.